Hot Box ® Installations
Thinking about a new stove? Here’s exactly what happens—survey, design, installation, compliance checks, commissioning and handover—so you know what to expect and how to prepare. Book a HETAS-qualified install with Hot Box Dundee, choose a compatible stove, and enjoy cleaner ignition with Hot Box ® Firestarter.
Book Installation (Dundee) Shop Stoves Ecodesign-Ready Stoves Spares & Accessories Buy Firestarter
Overview: The End-to-End Pathway
Our HETAS-qualified process is designed to be simple, safe and compliant—from first visit to first fire.
Survey
Heat-loss & room assessment, chimney/flue route, hearth & clearances, ventilation, and appliance suitability.
Design
We specify the stove, liner/twin-wall system, hearth, surround and notice plate details—ready for install.
Install
Safe system build, draught checks and appliance fit-off with attention to UK Building Regulations (Part J).
Commission
First burn setup, air controls, safety checks, CO alarm placement, and HETAS certificate where applicable.
1) Pre-Install Survey (What We Check)
- Room & Heat: Room volume, insulation level, air-tightness and target heat output.
- Chimney/Flue: Existing masonry & liner condition, or feasibility of a twin-wall route.
- Hearth & Surround: Non-combustible base specifications and opening/clearance checks.
- Air & Ventilation: Dedicated air supply requirements (especially for modern airtight homes).
- Location: Clearances to combustibles, furniture and mantel/beam distances.
- Compliance: Building Regulations considerations and Smoke Control Area guidance.
Tip: If you’re in a newer airtight property, we’ll specify a stove with an external air kit and confirm siting for the CO alarm during the survey.
2) Design & Specification (Getting It Right on Paper)
After survey, you’ll receive a clear specification covering:
- Appliance choice: From our stove collection, including Ecodesign-Ready models.
- Flue system: Liner grade/diameter or twin-wall route, terminations and support.
- Hearth & surround: Dimensions, materials and finish to suit your interior.
- Ancillaries: CO alarm, register plate, notice plate, and operational manuals.
Proceed to install Add accessories
3) Installation Day (What Happens On Site)
- Protection & prep: Dust-sheeting, access and safety setups.
- Flue/liner works: Liner/twin-wall sections fitted and sealed; correct clearances confirmed.
- Hearth & fit-off: Hearth set, stove positioned, joints sealed, and air supply tested.
- Draw & leak checks: Smoke/pressure tests as appropriate.
- Finishing: Surround refit, trims and notice plate installation.
Ready to light? On first light we recommend Hot Box ® Firestarter for a clean start, quicker flue warm-up and clearer glass.
4) Commissioning, Handover & Documentation
- First burn & controls: Air settings, reload cadence, and glass/airwash best practice.
- Safety: CO alarm placement check and ventilation review.
- Paperwork: Handover pack with notice plate details and (where applicable) HETAS certificate.
- Owner tips: Fuel quality, lighting technique and seasonal maintenance plan.
Book your installation Book chimney sweep
Aftercare & Servicing
Annual servicing and sweeping keeps efficiency high and protects your liner and appliance. If glass is blackening or rope seals are flattened, it’s time for a check-up.
Service / Sweep Shop spares Get Firestarter
FAQs
Do I need a chimney to install a wood burner?
No. If you don’t have a chimney, we can design a twin-wall flue route during the survey. Start here: Book installation.
How long does installation take?
Most straight-through installs are completed within a day; more complex twin-wall routes or building works can take longer. We’ll confirm timelines after survey.
Will my stove be Ecodesign-Ready and OK in a Smoke Control Area?
Yes—choose from our Ecodesign-Ready range. We’ll advise on model-specific Smoke Control permissions at survey.
What’s the cleanest way to light my new stove?
Use Hot Box ® Firestarter and open air controls fully for the first 10–15 minutes to warm the flue. This keeps glass clear and reduces smoke.

